This study is a preliminary design study for the ECRL station from Ch 0 to Ch 220 which covers the total length of 220 km. The main objective of this study is to carry out the transport planning and facility assessment for major East Coast Rail Link (ECRL) stations in Malaysia and preparation of Traffic Impact Assessment to be submitted to Project Proponent and Authorities. The main things that have been focused on is the impact of the road system to the station and evaluation for the road and junction performance. The proposed mitigation and traffic dispersal scheme has been imposed to each of the stations.
Client: HSS Integrated Sdn Bhd
Year: 2017
Status : Completed
This study is a feasibility study to determine the suitability of TOD development at the 8 stations along Kelantan to Gombak area which covers around 600 acres in total. The vision of this TOD development is to have a model town that enhances the livability of the neighborhood living. Our responsibility for this study is to identify all pertinent traffic issues which comprise of evaluation on the road and junction performance as well as proposed traffic circulation and mitigation for the redevelopment project which incorporates TOD elements.
Client: AECOM Perunding Sdn Bhd
Year: 2018
Status: Completed
Source Image: PLANMalaysia, 2017
This project is a feasibility study to determine the ridership of the 3 stations comprises Serendah, Kapar and Puncak Alam. The overall alignment of the ECRL is 640 km. The 3 stations of Serendah, Kapar and Puncak Alam is around 40km. The main objective of this study is to determine the passenger volumes likely to be generated by the proposed ECRL stations. A low case, base case and the high case with 3 option testing has been developed to forecast the ridership for these 3 stations.
Client: AECOM Perunding Sdn Bhd
Year: 2018
Status: Completed
Source Image: PLANMalaysia, 2017
This project is a feasibility study that studies the environmental impact on the extension line of ECRL from Gombak to Port Klang and Kota Baru to Pengkalan Kubor. The overall alignment of the ECRL is 640 km and for this study, the scope is cover for about 150 km. The main objective of this study comprises of preparation of the Traffic Impact Assessment (TIA) study for the EIA to scrutinise the existing traffic situation along the proposed alignment, to study the impacts during construction and subsequently the traffic impact on the surrounding road network system during the operation of the ECRL
Client: China Communications Construction Company
Year:2017-2018
Status: Completed